<P>PROBLEM TO BE SOLVED: To provide a slope stabilizing method capable of stabilizing a bedrock or a boulder stone and, at the same time, preventing the incursion of water from the outside by simplifying work to prevent weathering and erosion. <P>SOLUTION: A crack…
Adoban Kk
<P>PROBLEM TO BE SOLVED: To allow simultaneous use with a falling rock preventive construction method, and to allow seeding and planting even in a carrying-in difficult place of a construction machine. <P>SOLUTION: A wire net 2 is laid along a slope face N, and a…
<P>PROBLEM TO BE SOLVED: To provide a slope stabilizer capable of solving such a problem that a construction cost is greatly increased by enlarging work with spraying although stable work stabilizing slope is required by spraying a vegetative base material on the slope…
<P>PROBLEM TO BE SOLVED: To very easily carry out greening of natural ground in a slope stabilization work, and to stop flow-down of a sprayed coating material for greening. <P>SOLUTION: The slope stabilization equipment comprises molds B which are arranged on a line…
PROBLEM TO BE SOLVED: To prevent a wire from coming off a pressure-receiving member by dividing the pressure-receiving member attached to a projected end of a tensile member on the ground and penetrated into ground and anchored to effectuate an anchoring function, into upper and…
PROBLEM TO BE SOLVED: To enhance productivity by arranging upper and lower reinforcing bars in advance in a form, and folding connecting frames and the upper and lower main reinforcing bars between both side plates of the form. SOLUTION: In this form A comprising a plurality of…
<P>PROBLEM TO BE SOLVED: To provide a greening frame made to match the surrounding environment by building in order to stabilize a slope to very simply green the whole surrounding surface of a certain existing stable beam. <P>SOLUTION: The greening frame A comprises…
<P>PROBLEM TO BE SOLVED: To provide a pressure receiving method for slope stabilization work for solving the problem that difficult work and considerable labor are necessary for conveying the pressure receiving plate conventionally produced at a plant to a site and…
To provide an information processing apparatus, an information processing method, and an information processing program that can perform simulation of transactions.SOLUTION: An information processing apparatus 200 provides a function for simulation of financial transactions…
PROBLEM TO BE SOLVED: To provide a powder storage tank in which a bag filter can be formed smaller and the discharge of stored powder can be carried out efficiently. SOLUTION: A fluid mixed with cement and air is received from a transfer pipe 13 by a case 15. A bending section…
<P>PROBLEM TO BE SOLVED: To remarkably simplify labor and time-requiring works in which each collecting end of column forms and row forms are connected, collecting both forms carried on a job site in a plane crossed shape. <P>SOLUTION: Forms for a slope-protection…
To provide an information processing apparatus, an information processing method, and an information processing program that can perform simulation of transactions.SOLUTION: An information processing apparatus comprises: a storage unit that stores information on a first market…
PROBLEM TO BE SOLVED: To prevent the expansion (deformation) of a side plate by a method where in a spacing member for covering a top face opening of a form is formed from a porous top plate through which cast concrete passes, and a protruding plate protruding downward…