PROBLEM TO BE SOLVED: To form a revetment panel for an organism symbiosis type revetment in a shape proper to the living of a small organism in the vicinity of a water surface on the surface side of the panel, and to prevent the run-off of a back-fill material from a…
Geostr Corp
PROBLEM TO BE SOLVED: To provide a segment joint section structure capable of connecting segments together very simply, reliably, and firmly in particular. SOLUTION: A male metal 3 is protruded on the connecting end face of a segment 1, and a female metal 4 to be inserted with…
PROBLEM TO BE SOLVED: To produce a grout which shows expansion and shrinkage, both controlled at their respective low values or below. SOLUTION: This grout comprises: a hydraulic inorganic binder containing normal Portland cement and alumina cement, a calcium aluminate-based…
PROBLEM TO BE SOLVED: To enable easy, proper and rapid construction of a tide embankment, which is configured through the utilization of a steel pipe pile, by reducing working processes on a job site to the utmost.SOLUTION: A reception opening 2 for a pile head part Pa of an…
To provide a method for constructing earth retaining walls that efficiently constructs earth retaining walls for a channel or the like under a bridge for which there is a restriction on space.SOLUTION: The method for constructing earth retaining walls includes: a vertical…
PROBLEM TO BE SOLVED: To be able to maintain a state in which the opening of a connecting hole is sealed with a plate in a joint structure in which adjacent concrete members are joined. SOLUTION: A first concrete member A1 is provided with a box-shaped recess part 11 opening…
PROBLEM TO BE SOLVED: To eliminate works in a concrete product and facilitate the installation work and the fixing work of the concrete product even if it has a small inside hollow section and further eliminate such a danger that one slips because of the acute angle, when…