Managed pressure cementing
Abstract
A method of cementing a tubular string in a wellbore includes: deploying the tubular string into the wellbore; pumping cement slurry into the tubular string; launching a cementing plug after pumping the cement slurry; propelling the cementing plug through the tubular string, thereby pumping the cement slurry through the tubular string and into an annulus formed between the tubular string and the wellbore; and controlling flow of fluid displaced from the wellbore by the cement slurry to control pressure of the annulus.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for operating a wellbore, comprising: performing a drilling operation by injecting fluid to the wellbore having a tubular string disposed therein to circulate the fluid in a path including a bore of the tubular string and an annulus between the tubular string and a wall of the wellbore, and while performing the drilling operation: drilling through a formation while a bottomhole pressure is at a target bottomhole pressure; increasing the bottom hole pressure from the target bottomhole pressure to an expected pressure while drilling through the formation, wherein the expected pressure i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 11,248,439 B2 | Plugs and related methods of performing completion operations in oil and gas applications | 2022 | 0 |
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- At Balance With Smith; EmPower Automated MPD Technology brochure, date unknown, 8 total pages.
- Atkinson, et al.; A New Horizon in Multiphase Flow Measurement; Oilfied Review; Winter 2004/2005; 12 total pages.
- Australian Patent Examination Report for Application No. 2012254933; dated Apr. 23, 2014; 6 total pages.
- Beltran, et al.; SPE/IADC 130313; Managed Pressure Drilling Brings Added Value to Production Casings Cementing Dperations Increasing Success Rates and Quality in HPHT Fractured Narrow Window Wells; dated 2010; 8 total pages.
- Bjorkevoll et al.-"Innovative Design, Operational Modelling and Lessons Learned for Pressure Management During Underbalanced Cementing with Choked Return Flow," (OMC-2005-075) paper presented at the Offshore Mediterranean Conference and Exhibition in Ravenna, Italy, Mar. 16-18, 2005, 14 pages.