Oscillatory flow method for improved well cementing

80Forward Citations (#378368 Global)
1.9/yrCitation Velocity (#2213937 Global)
7.87Citation PageRank (#1578450 Global)
7Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

The present invention is a method for improving well cementing. A fluid such as drilling mud or preflush fluid is oscillated in the annulus prior to introduction of cement slurry into the annular interval to be cemented. The fluid is oscillated by changing its direction of flow at least twice. The oscillatory flow of the fluid flushes gelled drilling mud and filter cake from the annulus more effectively than conventional unidirectional flow. Following the oscillatory phase, cement slurry is pumped into the annular interval to be cemented, thus displacing the fluid, and is allowed to set. The fluid can be oscillated in the annulus either before or after the cement slurry is introduced into the casing. A selective check valve is also described which permits all fluids to flow in the forward direction out of the casing and into the annulus and which permits all fluids other than cement slurry to flow in the reverse direction out of the annulus and into the casing.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 80.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of cementing a wellbore having a casing extending longitudinally therein which provides an annulus between said casing and the wall of said wellbore, said method comprising: (a) introducing a fluid into said annulus; (b) causing said fluid to flow in said annulus; (c) changing the direction of flow of said fluid at least twice; (d) introducing a cement slurry into at least an interval of said annulus, thereby displacing said fluid from said interval; and (e) allowing said cement slurry to set.

  2. Claim 2Depends on #1

    The method of claim 1 wherein said fluid is drilling mud.

  3. Claim 3Depends on #2

    The method of claim 2 wherein said fluid is a preflush fluid.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • Haut et al., "Primary Cementing: Optimizing for Maximum Displacement", World Oil, Nov. 1980, pp. 105-116.
  • Haut et al., Primary Cementing: Optimizing for Maximum Displacement , World Oil , Nov. 1980, pp. 105 116.