Patents
US 9,945,703 B2#73888789 Most CitedActiveUnited States (USPTO)Utility

Multi-tank material balance model

0Forward Citations (#73888789 Global)
0.0/yrCitation Velocity (#73888789 Global)
0.56Citation PageRank (#73888789 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Embodiments are directed to performing material balance analysis for tanks in a petroleum reservoir and to performing dual porosity material balance analysis. In one scenario, a computer system divides a reservoir into multiple tank blocks, where at least two tank blocks are adjacent. The adjacent tanks are connected at a tank block boundary so that materials are permitted to travel between the tank blocks. The computer system determines flow rate between adjacent tank blocks proportional to the difference in tank block pressures. Then, upon making this determination, the computer system determines material balance for at least some of the tank blocks in the reservoir through influx and efflux of material across the tank block boundary. The material balance includes a determined material balance for one of the adjacent tank blocks and a determined material balance for the other adjacent tank block.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    At a computer system including at least one processor, a computer-implemented method for performing a material balance analysis for a plurality of tanks in a petroleum reservoir according to a multi-tank material balance model, the method comprising: dividing a petroleum reservoir into a plurality of different tank blocks, at least a first tank block and a second tank block of the plurality of tank blocks being adjacent so as to be connected at a reservoir tank block boundary such that materials are permitted to travel between the first and second tank blocks; determining a flow rate between t

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 3,035,440 AMethod and apparatus for testing formations196233
US 5,984,010 AHydrocarbon recovery systems and methods199927
US 6,101,447 AOil and gas reservoir production analysis apparatus and method2000320
US 2001015133 A1Gas recovery system and gas recovery method—35
US 2001037983 A1Oil recovery method and oil recovery apparatus—16
US 2002013687 A1Methods and systems for simulation-enhanced fracture detections in sedimentary basins—294
US 2002120429 A1Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories—257
US 2003225606 A1Tools for decision-making in reservoir risk management—101
US 2004015376 A1Method and system to value projects taking into account political risks—100
US 2004158406 A1Method for computing complexity, confidence and technical maturity indices for reservoir evaluations—54
US 2004220846 A1Stochastically generating facility and well schedules—156
US 2005038603 A1System and method for real time reservoir management—58
US 2005149307 A1Integrated reservoir optimization—286
US 2005209912 A1Method system and program storage device for automatically calculating and displaying time and cost data in a well planning system using a Monte Carlo simulation software—143
US 7,079,952 B2System and method for real time reservoir management2006141
US 2006224369 A1Performance prediction method for hydrocarbon recovery processes—105
US 2006289157 A1Gas-assisted gravity drainage (GAGD) process for improved oil recovery—58
US 2007016389 A1Method and system for accelerating and improving the history matching of a reservoir simulation model—224
US 2007028417 A1Door stop for child safety—22
US 2007143025 A1Method for selecting enhanced oil recovery candidate—34
US 7,289,942 B2Performance prediction method for hydrocarbon recovery processes200759
US 2007284107 A1Heavy Oil Recovery and Apparatus—64
US 2008052097 A1Method for economic valuation in seismic to simulation workflows—21
US 2008091283 A1Brownfield workflow and production forecast tool—32
US 2008252898 A1Method for optically testing semiconductor devices—26
US 2008262898 A1Method For Measuring The Overall Operational Performance Of Hydrocarbon Facilities—20
US 7,445,041 B2Method and system for extraction of hydrocarbons from oil shale200826
US 2009005630 A1Treatment method and soil treatment method—17
US 2009037115 A1Method for determining seismic data quality—19
US 2009084545 A1Method for managing production from a hydrocarbon producing reservoir in real-time—88

Non-Patent Literature (5)

  • "The Report of the BP U.S. Refiners Independent Safety Review Panel", Jan. 2007.
  • Batavia, "Front-End Loading for Life Cycle Success", Offshore Technology Conference Paper No. OTC-12980; Published Apr. 2001.
  • BDM-Oklahoma, Inc., "Feasability Study of Heavy Oil Recovery in the United States", U.S. Department of Energy, Document No. NIPER/BDM-0225; Published Mar. 1995.
  • Burns et al., "Gas Field Development: Automatic Selection of Locations for New Producing Wells", Society of Petroleum Engineers, Document No. SPE-2429; Published 1969.
  • Cordazzo et al., "Interblock Transmissibility Calculation Analysis for Petroleum Reservoir Simulation", Federal University of Santa Catarina, Nov. 2002, pp. 1-18.