Patents
US 7,079,952 B2#114507 Most CitedExpiredUnited States (USPTO)Utility

System and method for real time reservoir management

141Forward Citations (#114507 Global)
7.0/yrCitation Velocity (#119098 Global)
23.59Citation PageRank (#253524 Global)
50Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method of real time field wide reservoir management comprising the steps of processing collected field wide reservoir data in accordance with one or more predetermined algorithms to obtain a resultant desired field wide production/injection forecast, generating a signal to one or more individual well control devices instructing the device to increase or decrease flow through the well control device, transmitting the signal to the individual well control device, opening or closing the well control device in response to the signal to increase or decrease the production for one or more selected wells on a real time basis. The system for field wide reservoir management comprising a CPU for processing collected field wide reservoir data, generating a resultant desired field wide production/injection forecast and calculating a target production rate for one or more wells and one or more down hole production/injection control devices.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 141.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method comprising: receiving data indicative of at least one reservoir characteristic; determining, in relation to the data, a target production/injection in real time; and determining a control device setting in relation to the target production/injection.

  2. Claim 2Depends on #1

    The method of claim 1 further comprising: allocating the target production/injection between one or more selected reservoir management intervals of the reservoir; and determining the control device setting for a control device associated with at least one of the selected management intervals in relation to the target production/injection.

  3. Claim 3Depends on #2

    The method of claim 2 further comprising: comparing the target production/injection to an actual production/injection; and determining the control device setting in relation to a difference between the target production/injection a

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Ajayi, et al., "A Dynamic Optimisation Technique for Simulation of Multi-Zone Intelligent Well Systems in a Reservoir Development", SPE 84192 Society of Petroleum Engineers, Copyright 2003, pp. 1-7.
  • Allard et al., "Reservoir Management Making a Difference in Australia's 1<SUP>st </SUP>Oilfield Developed Entirely With Horizontal Wells," paper SPE 50051, SPE Asia Specific Oil & Gas Conf., Oct. 12-14, 1998, XP000931390, pp. 165-173.
  • Beamer et al., "From Pore to Pipeline, Filed Scale Solutions," Oilfield Review, vol. 10, No. 2, 1998, XP000961345, pp. 2-19.
  • Bjarte Bruheim, "Data Management-A key to Cost Effective E&P," Offshore, Dec. 1987.
  • Bogaert, et al., "Improving Oil Production Using Smart Fields Technology in the SF30 Satellite Oil Development Offshore Malaysia," OTC 16162, Offshore Technology Conference, Copyright 2004, pp. 1-7.