Patents
US 9,870,546 B1#9271242 Most CitedActiveUnited States (USPTO)Utility

System and method for industrial project cost estimation risk analysis

11Forward Citations (#9271242 Global)
1.4/yrCitation Velocity (#4072290 Global)
2.32Citation PageRank (#11488675 Global)
40Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A computer apparatus and method for analyzing and improving industrial turnaround or construction project manpower estimates. The apparatus comprises one or more processors in operative communication with one or more data stores and with at least one tangible medium upon which is encoded machine-readable software, the software, upon its execution, being configured so that the system carries out a process for analyzing and adjusting manpower cost estimates, outputting actionable results for display to users, and archiving and aggregating project execution data for use in future project analyzes to improve analysis and estimation accuracy over time by feeding back into the system data indicative of the scale and sources of historical execution inefficiencies.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 40 · Forward citations: 11.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    Computer apparatus for analyzing industrial turnaround or construction project execution estimates, the apparatus comprising one or more data stores, one or more processors in operative communication with the data stores, and one or more tangible computer-readable media upon which is encoded machine-readable software which, upon its execution, is configured so that the system carries out a process comprising: receiving from one or more user interfaces, and storing in one or more of the data stores, current estimated data expressed initially as, or convertible into, and one or more of current e

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (40)

PatentTitleYearCitations
US 2003023470 A1Project risk assessment—48
US 2003055695 A1Method and apparatus for managing project risk, and memory medium—20
US 2003101089 A1Method and system for quantitatively assessing project risk and effectiveness—66
US 2003167265 A1Computer method and user interface for decision analysis and for global system optimization—163
US 2003225605 A1Project risk management system and project risk management apparatus—44
US 6,675,127 B2Computerized systems and methods for managing project issues and risks200435
US 2004138897 A1System and method for selecting projects and allocating capacity to departments to maximize incremental value gained within a desired level of execution risk—27
US 2005197856 A1System, method and process for managing problems and risks associated with a construction project using project-specific software and project notice forms relative to the construction contract—20
US 2006136328 A1Method and system for analyzing the risk of a project—10
US 2006173762 A1System and method for an automated project office and automatic risk assessment and reporting—77
US 2006259336 A1Methods and systems for managing risks associated with a project—40
US 2007100775 A1Method for estimating the cost of a future project—16
US 2007255583 A1Method for analyzing risks in a technical project—13
US 7,318,038 B2Project risk assessment200824
US 7,318,039 B2Project risk management system utilizing probability distributions200825
US 2008082345 A1System and method for evaluating risks associated with delaying machine maintenance—58
US 2008103859 A1Project risk management system utilizing probability distributions—8
US 2008255910 A1Method and System for Adaptive Project Risk Management—79
US 2008288321 A1Automatic maintenance estimation in a plant environment—77

Non-Patent Literature (5)

  • "CII Learn About Benchmarking", https://www.construction-institute.org/nextgen/learn.cfm, visited Jul. 13, 2017 (Copyright 2017) (1 page).
  • "CII Performance Assessment", https://www.construction-institute.org/scriptcontent/bmm.cfm?section=pa, visited Jul. 13, 2017 (Copyright 2017) (1 page).
  • "Turnaround Network AP Networks", http://ap-networks.com/innovative-web-based-tools/turnaround-network/, visited Jul. 13, 2017 (Copyright 2001-2017) (2 pages).
  • AP Networks "Faciliated Turnaround Risk Workshop", http://ap-networks.com/turnarounds/facilitated-turnaround-risk-workshop/, visited Jul. 13, 2017 (Copyright 2001-2017) (2 pages).
  • AP Networks, "Benchmarking and Predicitive Analytics", http://ap-networks.com/benchmarking-predictive-analytics/, visited Jul. 14, 2017 (Copyright 2001-2017) (3 pages).