Patents
US 9,328,668 B2#91509184 Most CitedActiveUnited States (USPTO)Utility

Combined cycle power plant black start method where steam turbine provides increase in demanded load

0Forward Citations (#91509184 Global)
0.0/yrCitation Velocity (#91509184 Global)
0.56Citation PageRank (#91509184 Global)
19Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A reliable and flexible black start network restoration for a combined cycle power plant can be achieved by synchronizing a steam turbine and ramping that steam turbine up to an operating point where a maximum power increase is achieved. The resulting steam turbine load change can be compensated by the gas turbine. The increase in the demanded load can be provided by the steam turbine. The load of the steam turbine can also be gradually reduced to increase its load-increasing capacity.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for operating a combined cycle power plant during a black start, the combined cycle power plant comprising a gas turbine and a steam turbine that generate alternating voltage of an assigned frequency and deliver the alternating voltage to an AC network via an electric generator connected to the gas turbine and an electric generator connected to the steam turbine, wherein flue gas of the gas turbine is used for producing steam for the steam turbine for network restoration, the method comprising: a) supplying internal consumers by the gas turbine in island mode, an operating point of th

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (19)

PatentTitleYearCitations
GB 932,718 ACombined gas turbine and steam turbine power plant—6
US 4,589,255 AAdaptive temperature control system for the supply of steam to a steam turbine198652
EP 0,887,530 A2Gas turbine with exhaust gas recirculation—31
RU 2,200,850 C2Gas-and steam-turbine plant and method of its operation20034
US 2004045299 A1Method for starting up and loading a combined power plant—23
JP 2005232966 ACombined cycle power generation plant and its starting method—10
US 2006032232 A1Single shaft combined cycle power plant and its operation method—7
US 7,107,774 B2Method and apparatus for combined cycle power plant operation200658
WO 2006/097495 A2Method and device for production of controlled power by means of a combined gas and steam turbine plant—21
EP 1,736,638 A1Method of starting up a gas and steam turbine plant—8
US 2007130952 A1Exhaust heat augmentation in a combined cycle power plant—72
RU 2,312,229 C2Hybrid power system for continuous and reliable power supply in remote places200713
US 2008272597 A1Power generating plant—21
US 2009064656 A1Method for operating a combined-cycle power plant, and combined-cycle power plant useful for carrying out the method—13
EP 2,056,421 A2Method and system for power plant block loading—12
US 2009320493 A1Method for primary control of a combined gas and steam turbine arrangement—20
CN 101,713,334 APeak load management by combined cycle power augmentation using peaking cycle exhaust heat recovery—4
WO 2010/072524 A2Method for stabilization of the network frequency of an electrical power network—2
US 7,966,102 B2Method and system for power plant block loading20117

Non-Patent Literature (2)

  • Office Action (First Office Action) issued on Feb. 28, 2015, by the State Intellectual Property Office of People's Republic of China in corresponding Chinese Patent Application No. 201210330022.5 and an English Translation of the Office Action. (16 pages).
  • Yuanwang G et al., "Automatic Derivation and Assessment of Power System Black-Start Schemes", Automation of Electric Power Systems, China, vol. 28 No. 13, Jul. 10, 2004, pp. 50-54, p. 84.