Method and system for power plant block loading
Abstract
Block loading may occur during the process of restoring an electrical grid after a blackout. A method and system for coordinating the loading of a combined cycle power plant to support block loading is provided. The power plant may include a gas turbine and a steam turbine. The method and system may provide load control loops, for the gas and steam turbine, which support block loading.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of block loading at least one power plant, the method comprising: providing a block loading system on at least one power plant, wherein the at least one power plant comprises at least one gas turbine, at least one steam turbine, and at least one heat recovery steam generator; determining whether the at least one power plant is in a black start condition, wherein the at least one power plant is electrically disconnected from a grid; determining whether at least one block loading permissive of the block loading system is satisfied; exporting power to the grid to load a first block, wher
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗