Managed pressure cementing
Abstract
A method of cementing a tubular string in a wellbore includes: deploying the tubular string into the wellbore; pumping cement slurry into the tubular string; launching a cementing plug after pumping the cement slurry; propelling the cementing plug through the tubular string, thereby pumping the cement slurry through the tubular string and into an annulus formed between the tubular string and the wellbore; and controlling flow of fluid displaced from the wellbore by the cement slurry to control pressure of the annulus.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 29.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of cementing a tubular string in a wellbore extending from a wellhead, comprising: deploying the tubular string into the wellbore; pumping cement slurry into the tubular string; launching a cementing plug after pumping the cement slurry; propelling the cementing plug through the tubular string, thereby pumping the cement slurry through the tubular string and into an annulus formed between the tubular string and the wellbore; controlling flow of fluid displaced from the wellbore by the cement slurry to control pressure of the annulus; and after the cement slurry has been pumped into th
- Claim 2Depends on #1
The method of claim 1 , whe
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 29 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- At Balance With Smith-EmPower Automated MPD Technology brochure, date unknown, 8 pages.
- Austrailian Exam Report for Patent Application No. 2012254933, dated Apr. 23, 2014.
- Bjorkevoll et al.-Utilize Manage Pressure Drilling Equipment and Technique to Cement a Severely Depleted HPHT Reservoir in the North Sea, SPE-115118, paper prepared for presentation at the 2008 SPE Russian Oil & Gas Technical Conference and Exhibition held in Moscow, Russia, Oct. 28-30, 2008, 11 pag
- Fredericks et al.-Experience and Results with a New Automated MPD System while Drilling and Cementing Liner in an Onshore Depleted Gas Field, SPE/IADC 130319, paper prepared for presentation at the 2010 SPE/IADC Managed Pressure Drilling and Underbalanced Operations Conference and Exhibition held in
- Hager et al.-Monitoring of Hydration Processes in Cement Materials by Broadband Time-Domain-Reflectometry Dielectric Spectroscopy, Materials Science and Technology (MS&T) 2007, Sep. 16-20, 2007, Detroit Michigan, Processing and Product Manufacturing: Advances in Cement-Based Materials: Manufacturing