Patents
US 9,206,345 B2#18920863 Most CitedActiveUnited States (USPTO)Utility

Wellbore servicing compositions and methods of making and using same

6Forward Citations (#18920863 Global)
0.6/yrCitation Velocity (#14674059 Global)
1.16Citation PageRank (#33788678 Global)
14Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method of servicing a wellbore in a subterranean formation comprising tethering a relative permeability modifier to one or more surfaces of the formation via a coupling agent. A method of servicing a wellbore in a subterranean formation comprising introducing into the wellbore a first wellbore servicing fluid comprising a coupling agent; allowing the coupling agent to associate with the surface of the formation; introducing into the wellbore a second wellbore servicing fluid comprising a relative permeability modifier; and allowing the relative permeability modifier to associate with the coupling agent. A method of servicing a wellbore in a subterranean formation comprising placing into the formation a wellbore servicing fluid comprising a coupling agent and a relative permeability modifier; and allowing the relative permeability modifier to associate with the formation.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 6.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of servicing a wellbore in a subterranean formation comprising: introducing into the wellbore a first wellbore servicing fluid comprising a coupling agent; allowing the coupling agent to associate with the surface of the formation; introducing into the wellbore a second wellbore servicing fluid comprising a relative permeability modifier; and allowing the relative permeability modifier to associate with the coupling agent.

  2. Claim 2Depends on #1

    The method of claim 1 wherein allowing the coupling agent to associate with the surface of the formation; allowing the relative permeability modifier to associate with the coupling agent or both comprises shutting-in the wellbore.

  3. Claim 3Depends on #2

    The method of claim 2 wherein the wellbore is shut-in for a period of time ranging from 1 hour to 48 hours.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • Foreign communication from a related counterpart application-International Search Report and Written Opinion, PCT/US2014/015324, Apr. 2, 2014, 10 pages.
  • International Preliminary Report on Patentability issued in related PCT Application No. PCT/US2014/015324, mailed Aug. 27, 2015 (9 pages).