Well treatment fluid and methods for blocking permeability of a subterranean zone
Abstract
The present invention provides a method and treatment fluid for blocking the permeability of an elevated-temperature zone in a reservoir of a subterranean formation penetrated by a wellbore, the method comprising the steps of: a) selecting the zone to be treated, wherein the upper limit of the temperature range of the zone is equal to or greater than 190° F. (88° C.); b) forming a well treatment fluid comprising: water; a water-soluble polymer comprising polymerized vinyl amine units; and an organic compound capable of crosslinking with the vinyl amine units of the water-soluble polymer; c) selecting the water-soluble polymer and the organic compound of the well treatment fluid such that the gel time of the well treatment fluid is at least 2 hours when measured at the upper limit of the temperature range of the zone; and d) injecting the well treatment fluid through the wellbore and into the zone.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 34.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method for blocking the permeability of an elevated-temperature zone in a reservoir of a subterranean formation penetrated by a wellbore, the method comprising the steps of: a. forming a well treatment fluid comprising: i. water; ii. a water-soluble polymer comprising polymerized vinyl amine units, wherein the water-soluble polymer further comprises polymerized vinyl alcohol units; iii. an organic compound capable of crosslinking with the vinyl amine units of the water-soluble polymer; and d. injecting the well treatment fluid through the wellbore and into the zone.
- Claim 2Depends on #1
The method according to claim 1 , wherein the water is selected from the group consisting of fresh water, seawater, natural brine, formulated brine, 2% KCl solution, and any combination in any proportion of the foregoing.
- Claim 3Depends on #1
The method according to claim 1 , wherein the organi
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗