User interface including scheduling hint and material sufficiency indicator for production planning
Abstract
The description refers to a method, computer program product, and computer system for displaying a chart for production planning. The chart includes a timeline, a material area associated with each of one or more materials and a resource area associated with each of one or more resources. The chart also includes a material sufficiency indicator provided within one or more of the material areas to indicate whether or not a sufficient amount of the associated material is available at one or more identified times to meet a demand of the one or more scheduled operations. The chart includes a scheduling hint that is displayed within a material area when an operation identifier has been selected. The scheduling hint identifies one or more portions within the material area for a material as providing either sufficient material or insufficient material for performance of the operation associated with the selected operation identifier.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer program product, the computer program product being embodied on a non-transitory computer-readable storage medium and including executable code that, when executed, is configured to cause at least one data processing apparatus to: display a chart for production planning, the chart including a timeline, a material area associated with each of one or more materials and a resource area associated with each of one or more resources, wherein an operation identifier is provided at a location within one of the resource areas to indicate a time that a first operation has been scheduled to b
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2016357379 A1 | Schedule management system and schedule management method | — | 1 |
References Cited — Backward Prior Art (17)
Non-Patent Literature (4)
- Chan et al.,"An Efficient Format for Nearly Constant-Time Access to Arbitrary Time Intervals in Large Trace Files", Argonne National Laboratory, 2007, pp. 16.
- Mulvehill-A., "A User Interface for a Knowledge-Based Planning and Scheduling System", IEEE, 1998, pp. 514-521.
- Schumann-A., "SAP-R/3 in Process Industries: Expectations, Experiences and Outlooks", Elsevier, 1997, pp. 161-166.
- Zhang et al., "Self-Construction Production Schedulng System" ,IEEE, 2006, pp. 519-523.