Methods and systems for assigning jobs to production devices
Abstract
A method of assigning a job to a production device may include identifying a queue comprising a plurality of print jobs, identifying a plurality of print production devices capable of processing the plurality of print jobs, determining that one of the identified print production devices is an idle print production device, identifying a top priority print job from the queue, determining a completion time associated with processing the top priority print job by each of the identified print production devices, identifying a fastest print production device, assigning the top priority print job to the fastest print production device, determining whether the fastest print production device is the idle print production device, and in response to determining that the fastest print production device is the idle print production device, sending the top priority print job to the fastest print production device and removing the top priority print job from the queue.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of assigning a job from a queue to a production device in a print production environment, the method comprising: identifying a queue comprising a plurality of print jobs, wherein each print job is associated with a unique priority value; identifying a plurality of print production devices capable of processing the plurality of print jobs; determining, by a computing device, that one of the identified print production devices is currently an idle print production device; identifying a top priority print job from the queue, wherein the top priority print job is a print job from the plur
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗