Patents
US 6,993,400 B2#2429805 Most CitedExpiredUnited States (USPTO)Utility

System and method for real-time assignment of jobs to production cells

29Forward Citations (#2429805 Global)
1.4/yrCitation Velocity (#3718303 Global)
3.46Citation PageRank (#6019338 Global)
5Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

System and method for real-time job cell-assignment using soft-computing is provided. The system includes a work-in-progress module, a load estimation module and a fuzzy inference module. Clients send jobs to the system and the system evaluates a plurality of document processing cells' capacity to process the jobs taking into consideration the cells' current workload and the cells' capacity to process the job. Specifically, the work-in-progress module determines a work-in-progress (“WIP”) value for each cell that represents a current workload, and the load estimation module estimates a load value that represents how busy the cell is for jobs of a certain type. The fuzzy inference module applies the WIP and the estimated load values to a set of membership functions to associate the values with fuzzy values. The module determines merit values for the cells using the fuzzy values, and selects the cell having the largest merit value to route the job to.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 29.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method comprising: determining for each one of a plurality of production cells a number of jobs already being processed and waiting to be processed by the production cell; estimating for each of the production cells a capacity of the production cell to process a new job awaiting processing; and selecting one of the production cells that is least busy to process the new job based upon the determined number of jobs and the corresponding estimated capacity of each cell using a fuzzy logic algorithm.

  2. Claim 2Depends on #1

    The method as set forth in claim 1 further comprising routing the new job to the selected least busiest production cell.

  3. Claim 3Depends on #1

    The method as set forth in claim 1 further comprising performing the determining, estimating and selecting for another new job awaiting processing.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • Shaout, A. et al., "Job Scheduling Using Fuzzy Load Balancing In Distributed Systems," Electronics Letters, vol. 34, No. 20, pp. 1983-1985 (1998).
  • Zhang, R. et al., "Fuzzy Control of Queuing Systems, "IEEE Trans. On Fuzzy Systems, vol. 7, No. 1, pp. 17-26 (2000).