Perforating gun assembly and method for controlling wellbore pressure regimes during perforating
Abstract
A method comprises: a. determining a configuration of a gun string, b. determining, by a computer, a pressure transient at a location in a wellbore, c. comparing the one or more pressures with the one or more pressure thresholds at the location, and d. perforating the wellbore with the gun string using the determined configuration of the gun string when the one or more pressures meet the one or more pressure thresholds at the location. The location in the wellbore has one or more pressure thresholds, and the pressure transient comprises one or more pressures.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method comprising: a. determining a configuration of a gun string, wherein the gun string comprises: a plurality of perforating charges supported within a carrier gun body, wherein the plurality of perforating charges and the carrier gun body are configured to create a dynamic underbalance condition when the plurality of perforating charges are detonated; and a secondary pressure generator operably associated with at least one of the perforating charges, wherein the second pressure generator is configured to reduce at least one of a peak of the underbalance condition or a duration of the und
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| WO 2016/118179 A1 | Perforating guns that include metallic cellular material | — | 6 |
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Atwood, D.C., et al., "Flow Performance of Perforation Tunnels Created with Shaped Charges Using Reactive Liner Technology," Society of Petroleum Engineers (SPE) European Formation Damage Conference, May 2009, The Netherlands.
- FAIPP Office Action dated Jan. 14, 2014, U.S. Appl. No. 13/610,855, filed Sep. 11, 2012.
- FAIPP Office Action dated Jul. 16, 2013, U.S. Appl. No. 13/563,719, filed Jul. 31, 2012.
- FAIPP Office Action dated Jul. 17, 2013, U.S. Appl. No. 13/857,145, filed Apr. 14, 2013.
- FAIPP Pre-Interview Communication dated Aug. 22, 2013, U.S. Appl. No. 13/610,855, filed Sep. 11, 2012.