Reservoir communication with a wellbore
Abstract
A method and apparatus for improving reservoir communication includes, in one arrangement, use of one or more chambers to create an underbalance condition and/or a fluid surge in the wellbore. In another arrangement, a tool string comprises a packer, a circulating valve, and an atmospheric chamber, in which the circulating valve, when open, is adapted to vent a lower wellbore region below the packer when the packer is set, and the atmospheric chamber is capable of being operated to create an underbalance condition below the packer. In yet another arrangement, an apparatus comprises a subsea wellhead equipment including a blow-out preventer, choke line filled with a low density fluid, and a kill line filled with a heavy fluid. The choke line is adapted to be opened to create an underbalance condition in the wellbore. In yet another arrangement, a method of creating an underbalance condition comprises controlling wellbore pressure at least in a perforating interval to achieve a target level, configuring a perforating gun to achieve a target detonation pressure in the perforating gun upon detonation, and creating an underbalance condition in the perforating interval of the wellbore wh
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 129.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A tool string for use in a wellbore, comprising: an assembly having at least a first chamber and a second chamber; and control elements to enable communication with the first chamber to create an underbalance condition in the wellbore and to enable communication with the second chamber to create a flow surge from a formation, wherein the first chamber has a first volume and the second chamber has a second volume larger than the first volume.
- Claim 2Depends on #1
The tool of claim 1 , further comprising a perforating gun activatable when an underbalance condition is created to perform underbalance perforating.
- Claim 3Depends on #1
The tool string of claim 1 , wherein the control elements include flow control devices.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 129 total)
References Cited — Backward Prior Art (20)
Non-Patent Literature (2)
- Overview of Implo Treat pamphlet, Implo Treat Systems, Jan. 17, 2000 (4 pages).
- Scott, Wu and Bridges, "Air Foam Improves Efficiency of Completion and Workover Operations in Low-Pressure Gas Wells", SPE 27922, Dec., 1995, pp. 219-225.