Method for accelerating start-up for steam-assisted gravity drainage (SAGD) operations
Abstract
A method for accelerating start-up for steam assisted gravity drainage operations comprising the steps of: forming a steam-assisted gravity drainage production well pair comprising an injection well and a production well within a formation; beginning a pre-soaking stage by soaking one or both of the wellbores of the well pair with a solvent; beginning a pre-heating stage by heating the wellbores of the well pair; beginning a squeezing stage by injecting steam into the wellbores of the well pair; and beginning steam-assisted gravity drainage production.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 10.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for accelerating start-up for steam assisted gravity drainage operations comprising the steps of: a) forming a steam-assisted gravity drainage production well pair within a formation comprising an injection well and a production well; b) beginning a pre-soaking stage by soaking at least one of the wellbores of the well pair with a solvent; c) beginning a pre-heating stage by heating the soaked wellbore of the well pair by one of electric, electromagnetic, microwave, radio frequency heating and steam circulation within the wellbore; d) beginning a squeezing stage by injecting steam int
- Claim 2Depends on #1
The method of claim 1 , wherein the pre-soaking
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗