Method of completing and producing long lateral wellbores
Abstract
Long lateral wellbores are prepared for the production of hydrocarbons by preparing only a portion of the wellbore for production at a time, starting at a remote end of the long lateral wellbore. The prepared production section is produced until production becomes uneconomic before a further production section is prepared and produced.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 48 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of preparing to produce hydrocarbons from a cased and cemented long lateral wellbore, comprising: selecting a length of a first production section at a furthest reach of the long lateral wellbore, the selected length of the first production section being less than a total length of the long lateral wellbore; perforating the cased and cemented long lateral wellbore in discrete perforating runs and selecting a length of each perforation run with consideration to re-stimulation of the first production section at a later date by taking into account potential pressure loss in a work string
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (48)
Non-Patent Literature (2)
- Energy Information Administration-"Drilling Sideways-A Review of Horizontal Well Technology and its Domestic Application", Apr. 1993, DOE/EIA-TR-0565; Distribution Category UC-950.
- Energy Information Administration—“Drilling Sideways—A Review of Horizontal Well Technology and its Domestic Application”, Apr. 1993, DOE/EIA-TR-0565; Distribution Category UC-950.