In-situ fluid compatibility testing using a wireline formation tester
Abstract
A method for performing fluid influx tests in a wellbore comprises inserting a well test device into the wellbore such that it separates a well test section from other sections of the wellbore; performing a first fluid influx test during which fluid pressure in the test section is reduced, pore fluid is induced to flow into the test section and fluid influx into the test section is monitored; injecting a completion fluid into the test section, and inducing the completion fluid to flow into the formation; performing a second fluid influx test during which fluid pressure within the test section is reduced, completion and pore fluids are induced to flow into the test section, and fluid influx into the test section is monitored; comparing fluid influx monitoring data acquired during the fluid influx tests to determine any effects of the completion fluid on formation pore fluid influx into the test section.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for performing fluid influx tests in a wellbore traversing a permeable formation, comprising: a) inserting a well test device comprising a straddle packer assembly into the wellbore such that the straddle packer assembly separates a test section from other sections of the wellbore; b) performing a first fluid influx test during which the fluid pressure the test section is reduced, pore fluid is induced to flow from the pores of the permeable formation into the test section and fluid influx into the test section is monitored; c) injecting a first completion fluid into the test section,
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗