Patents
US 7,367,395 B2#2077641 Most CitedExpiredUnited States (USPTO)Utility

Sand control completion having smart well capability and method for use of same

32Forward Citations (#2077641 Global)
1.8/yrCitation Velocity (#2586102 Global)
3.27Citation PageRank (#6608102 Global)
16Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A sand control completion ( 100 ) for installation in a wellbore ( 102 ) includes first and second packers ( 114, 116 ) that define a first zone ( 110 ) in the wellbore ( 102 ). A production tubing ( 120 ) extends substantially through the first zone ( 110 ). Positioned between the first and second packers ( 114, 116 ) are a sand control screen ( 130 ), an inflow control valve ( 122 ) and a crossover valve ( 126 ). The sand control screen forms a first annulus ( 152 ) with the production tubing ( 120 ) and a second annulus with the wellbore ( 102 ). The inflow control valve ( 122 ) is operable to selectively allow and prevent fluid communication between the first annulus ( 152 ) and the interior of the production tubing ( 120 ). The crossover valve ( 126 ) is operable to selectively allow and prevent fluid communication between the production tubing ( 120 ) and the second annulus.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 32.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A sand control completion for installation in a wellbore, the completion comprising: first and second packers that define a first zone in the wellbore; a production tubing extending substantially through the first zone; a sand control screen positioned between the first and second packers and forming a first annulus with the production tubing and a second annulus with the wellbore; an inflow control valve positioned between the first and second packers that is operable to selectively allow and prevent fluid communication between the first annulus and the interior of the production tubing; and

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (3)

  • Bixenman et al.; "Design and Deployment of an Intelligent Completion with Sand Control"; Society of Petroleum Engineers Inc.; 2001; pp. 1-9.
  • International Preliminary Report on Patentability; Patent Cooperation Treaty; Mar. 27, 2007; 7 pages.
  • International Search Report; Patent Cooperation Treaty; 4 pages.