Patents
US 8,306,849 B2#43526871 Most CitedActiveUnited States (USPTO)Utility

Predicting success of a proposed project

2Forward Citations (#43526871 Global)
0.1/yrCitation Velocity (#39925850 Global)
0.93Citation PageRank (#46122329 Global)
20Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A computer implemented method, system, and/or computer program product predicts a success of a currently proposed project. Responsive answers to a survey questionnaire for a currently proposed project are received and used to create a predicted success score for the currently proposed project, based on a pattern of responsive answers to a predetermined combination of questions from the survey questionnaire. The predicted success score for the currently proposed project is compared with and matched to actual success scores from prior projects. If the percentage of prior projects that retained their success scores through completion exceeds a predetermined accuracy threshold, then the currently proposed project is approved for implementation.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 2.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer implemented method of predicting a success of a currently proposed project, the computer implemented method comprising: a processor receiving responsive answers to a survey questionnaire for a currently proposed project, wherein the currently proposed project is described in a contract between a vendor and a customer, wherein questions from the survey questionnaire are directed to details of how a contract between a vendor and a customer for the currently proposed project was created without regard to specifics as to how the currently proposed project will be performed, wherein the

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (2 of 2 total)

References Cited — Backward Prior Art (20)

PatentTitleYearCitations
US 2002107823 A1System and method for an automated scoring tool for assessing new technologies—14
US 2005203786 A1Method, system and program product for assessing a product development project employing a computer-implemented evaluation tool—18
US 2005283751 A1Method and apparatus for automated risk assessment in software projects—99
US 2006173762 A1System and method for an automated project office and automatic risk assessment and reporting—77
US 2006259336 A1Methods and systems for managing risks associated with a project—40
US 7,233,908 B1Method and system for presentation of survey and report data200752
US 7,313,531 B2Method and system for quantitatively assessing project risk and effectiveness200739
US 7,359,865 B1Generating a risk assessment regarding a software implementation project200899
US 2008133259 A1Information technology enterprise manager—21
US 2008235151 A1Method and system for risk-hedging in project management—5
US 2008270197 A1Project status calculation algorithm—14
US 2008294504 A1Method of Evaluating a Project Manager of a Project of a Provider—11
US 2009070188 A1Portfolio and project risk assessment—42
US 2009138306 A1Facility risk assessment systems and methods—44
US 2009216628 A1Configurable, questionnaire-based project assessment—8
US 2009265200 A1System and Method for Governance, Risk, and Compliance Management—23
US 2010030614 A1Systems and Methods for Facilitating an Analysis of a Business Project—16
US 7,664,670 B1Product development and assessment system201032
US 7,729,932 B2Project assessment system and method201015
US 8,086,483 B1Analysis and normalization of questionnaires201117

Non-Patent Literature (5)

  • Hardgrave, Billy Charles. "A Contingency Model for Selecting an Information System Prototyping Strategy". Jul. 1993.
  • Hwang, Anne A.; "Yours, Mine, Ours: The Role of Joint Personal Projects in Close Relationships". May 2004.
  • IBM, "Initial Delivery Index" IP.Com Number: IPCOM000183631D, May 29, 2009, pp. 1-3.
  • J.L. Ward, "Recognizing Project Warning Signs", ESI Horizons Newsletter, December 2003, ESI International, pp. 1-4, http://www.esi-intl.com/public/publications/122003executivewarningsigns.asp.
  • J.L. Ward, "Recognizing Project Warning Signs, Part 2", Project Manager Today, vol. 16, No. 4, pp. 25-28, http://esi-intl.com/public/publications/022004executivewarningsigns-part2.asp.