Project assessment system and method
Abstract
A computer readable storage medium encoded with a project assessment program for assessing a project including a plurality of processes when executed by a computer computing forecasts of the project based on a set of information. At least one scheme by a user input is selected from a group of schemes including an estimation of mutual-correlation of estimated value pattern. Process planning information, up-to-date actual process information and forecast model information of each process included in the project is retrieved. The forecast model information of each process of the project is defined as probability distribution variations of a plurality of parameters of the processes, wherein the probability distribution variations are quantitative values of the project. Estimated values of variations in at least two parameters of the processes using the process planning information, the up-to-date actual process information and the forecast model information are computed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 15.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer readable storage medium encoded with a project assessment program for assessing a project comprising a plurality of processes when executed by a computer computing forecasts of said project based on a set of information, comprising: selecting at least one scheme by a user input from the group of schemes comprising of an estimation of frequency distribution, an estimation of mutual-correlation of estimated value pattern, an estimation of standard deviation, an estimation of time-series information, and an estimation of fit to a predetermined pattern; based on the at least one selecte
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 15 total)
References Cited — Backward Prior Art (22)
Non-Patent Literature (2)
- Shigeru Yamada, "Software/Introduction to Management Model (Conclusion) bit", Kyoritsu Shuppan Co., Ltd., Mar. 1, 1991, vol. 23, pp. 64-71.
- Yoshihiro Kuwazawa, "Making Full Use of Cutting Edge Information Technology, No. 6 Project Management Software, Paving the way for Risk Hypothesis and Verification, Challenge of Realizing Collaboration Between Tools" Network Computing, Ric Telecom Co., Ltd., Oct. 1, 1999, vol. 11, No. 10, pp. 74-77.