Effective cycle time management employing a multi-horizon model
Abstract
Cycle time and throughput of a manufacturing facility is effectively manages by a control system that employs a combination of a long-term horizon model and at least one short-term horizon model to generate control signals for a set of machines in a manufacturing facility. The long-term horizon model determines long-term average time allocation percentage for each machine for a given set of throughput targets and cycle time targets for products to be manufactured. Each of the at least one short-term horizon model determines queues for immediate use at processing tools, while the queues are subjected to a secondary adjustment based on the time allocation constraints generated by the long-term horizon model. The combination of the long-term and the at least one short-term horizon models provides a stable long-term proactive WIP bubble-management as well as short-term WIP bubble management.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for providing control signals for operation of a plurality of machines in a manufacturing facility, said system comprising a computer and a communication means, wherein said computer is configured to perform the steps of: determining, for each machine within a plurality of machines in a manufacturing facility, an optimal workstation usage allocation for multiple types of products that are manufactured in said manufacturing facility by employing said computer; determining, for each machine within said plurality of machines in said manufacturing facility, a queue of tots to be processed
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (3)
- Dai, J.G. et al., "Maximum Pressure Policies in Stochastic Processing Networks" Operations Research (2005) pp. 197-218, vol. 53(2).
- Fleischer, L. et al., "Efficient Algorithms for Separated Continuous Linear Programs: The Multicommodity Flow Problem with Holding Costs and Extensions" Mathematics of Operations Research (2005) pp. 916-938, vol. 30(4).
- Leachman, R.C. et al., "SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics" Interfaces (2002) pp. 61-76, vol. 32(1).