Method for target queue time calculation in semiconductor manufacturing planning
Abstract
A method is provided for product culmination estimation in a microelectronics manufacturing environment. The method includes providing a manufacturing executing system including a plurality of processing entities. The manufacturing executing system provides interconnectivity and management of the processing entities. The method also assigns a standard queue time factor to product advancing through the manufacturing executing system, and determines an actual and theoretical cycle time and associated with the product through each process entity of the manufacturing executing system. The method further includes anticipating a target queue time for the product through the manufacturing executing system, and forecasting product cycle time of the product through the manufacturing executing system.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 5.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A software program stored on a recordable medium, the software program being used for product culmination estimation in a semiconductor fabrication facility (fab), the software program comprising: instructions for receiving a lot size for a product to be processed by a plurality of process events; instructions for determining a theoretical cycle time (TCT) as a sum of processing times for the plurality of process events for the lot size; instructions for determining a target queue time (TQT) as a function of a standard theoretical cycle time (STCT) and a standard queue time factor (QTF) assign
- Claim 2Depends on #1
The software program of claim 1 , wherein the function for product culmination es
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗