System and method of dynamic underbalanced perforating using an isolation fluid
Abstract
A system for dynamic underbalanced perforation of a hydrocarbon well includes a perforation fluid located within the hydrocarbon well. A perforation gun is suspended within the perforation fluid and a completion fluid is located within the hydrocarbon uphole of the perforation fluid. An isolation fluid is located within the hydrocarbon well uphole of the perforation fluid and downhole of the completion fluid. A method of perforating a hydrocarbon well includes a perforation fluid placed in the hydrocarbon well. A perforation gun is placed within the perforation fluid. A completion fluid is placed in the hydrocarbon well. An isolation fluid is placed in the hydrocarbon well. A local dynamic underbalance condition is created in the hydrocarbon well. A flow of the completion fluid downhole is inhibited.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 3.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A system for dynamic underbalanced perforation of a hydrocarbon well, the system comprising: a perforation liquid located within the hydrocarbon well at a target zone adjacent to a hydrocarbon formation; a perforation gun suspended within the perforation liquid and adjacent to the hydrocarbon formation; a completion liquid located within the hydrocarbon well uphole of the perforation liquid, a weight of the completion liquid places the perforation liquid in an overbalanced state; and an isolation fluid located within the hydrocarbon well uphole of the perforation liquid and downhole of the com
- Claim 2Depends on #1
The system of claim 1 wherein the perforation gun creates a dynamic underbalanced condition local to the target zone of the well, the isolation fluid impedes the movement o
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (24)
Non-Patent Literature (1)
- Chang, F. F. et al., SPE94596. "Recommended Practice for Overbalanced Perforating in Long Horizontal Wells.", May 2005.