Standoff correction for LWD density measurement
Abstract
A method for conducting density measurements in downhole environments corrects for high standoff, by adding a second correction term to the spine and rib method. This second term is a correction based on an apparent standoff estimated using the photo electric effect of the mud. This correction is term depends on the mud properties, both in terms of apparent standoff and correction and therefore requires property calibration for each well. The calibration can be done using the azimuthal information available with LWD tool when the tool is turning. At each depth in homogeneous formation, there can be a succession of density measurements with various tool standoff when the tool is not centered in the borehole. All this information is used to build up a standoff correction fitting perfectly the mud properties.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 12.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for correcting logging while drilling formation density measurements affected by tool standoff comprising the steps of: determining an initial formation density measurement at a defined formation depth, the initial formation density measurement being equal to an apparent formation density, wherein determining the initial formation density measurement comprises identifying from collected formation data at least one primary density quadrant of a formation at the defined formation depth; calculating, by a computer, a tool standoff measurement; after calculating the tool standoff measurem
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (5)
Non-Patent Literature (5)
- "SlimXtreme: The slim logging solution for hostile environments"; Schlumberger, SMP5865, Apr. 2002, 4 pages.
- Bosworth, S. et al.; "Key Issues in Multilateral Technology"; Schlumberger; Oilfield Review, Winter 1998; pp. 14-28.
- Curtis, C. et al.; "Heavy-Oil Reservoirs"; Schlumberger; Oilfield Review, Autumn 2002; pp. 30-51.
- Fraija, J. et al.; "New Aspects of Multilateral Well Construction"; Schlumberger; Oilfield Review, Autumn 2002; pp. 52-69.
- International Search Report dated Mar. 5, 2008 (3 pages).