Patents
US 6,590,202 B2#6929019 Most CitedExpiredUnited States (USPTO)Utility

Standoff compensation for nuclear measurements

14Forward Citations (#6929019 Global)
0.6/yrCitation Velocity (#12924362 Global)
2.53Citation PageRank (#9994369 Global)
17Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A nuclear logging-while-drilling measuring systems, and the correction of the formation property measurements for adverse effects of instrument standoff from the borehole wall, is disclosed. Detector responses for one or more downhole detectors are sampled and recorded over a time segment. The response samples are then sorted by magnitude, and a running integral of the sorted samples as a function of time is performed over the time segment. Linear segments are then fitted to the running integral, wherein each straight line segment is a function of one or more formation properties, and also a function of the standoff distance of the detector from the borehole wall. Segments are then combined to obtain a measure of one or more formation properties of interest such as formation density, where the adverse effects of borehole standoff are minimized. Standoff magnitude is also obtained and can be used to correct other logs, such as a neutron porosity log, for adverse effects of tool standoff and borehole size. No independent caliper of the borehole is required to perform the standoff correction.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 14.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for determining a property of earth formation penetrated by a borehole, comprising the steps of: (a) positioning at least two radiation detectors within said borehole; (b) measuring a plurality of detector responses from each of said at least two detectors over a time interval; (c) sorting by magnitude said detector responses collected over a sample period from a first detector into sorted first detector responses; (d) determining standoff of said first detector from a borehole wall during a time segment from said at sorted first detector responses; and (e) combining said determined s

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (17)

PatentTitleYearCitations
EP 0,389,345 A2Methods and apparatus for epithermal neutron logging—20
US 5,091,644 AMethod for analyzing formation data from a formation evaluation MWD logging tool1992104
EP 0,519,675 A1Method and apparatus for correcting measurement-while-drilling porosity—6
US 5,175,429 AStand-off compensation for nuclear MWD measurement199249
GB 2,261,068 ANuclear borehole logging using lithium detector assemblies—6
US 5,235,185 AFormation sigma measurement from thermal neutron detection199347
US 5,250,806 AStand-off compensated formation measurements apparatus and method1993128
US 5,397,893 AMethod for analyzing formation data from a formation evaluation measurement-while-drilling logging tool1995101
US 5,420,422 AMethods and apparatus for epithermal neutron porosity logging199518
US 5,451,779 AFormation density measurement apparatus and method199567
US 5,473,158 ALogging while drilling method and apparatus for measuring formation characteristics as a function of angular position within a borehole1995117
US 5,486,695 AStandoff compensation for nuclear logging while drilling systems199678
US 5,513,528 ALogging while drilling method and apparatus for measuring standoff as a function of angular position within a borehole1996120
GB 2,320,567 AInvestigating properties of earth formations surrounding a borehole—10
US 6,307,199 B1Compensation of errors in logging-while-drilling density measurements2001107
GB 2,362,949 AAnalysis of downhole formation fluid contaminated by oil-based mud—12