Patents
US 7,784,539 B2#7720680 Most CitedActiveUnited States (USPTO)Utility

Hydrocarbon recovery testing method

13Forward Citations (#7720680 Global)
0.8/yrCitation Velocity (#9081644 Global)
2.16Citation PageRank (#12825731 Global)
17Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A method of testing the response of a subterranean formation to a formation treatment is described including the injection of a treatment fluid and the production of formation fluids from two separate boreholes or two boreholes from a single well such that the treatment fluid sweeps the formation between the two boreholes, and the use of downhole monitoring devices to determine a volume swept by the treatment fluid.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 13.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of testing the response of a subterranean formation to a formation treatment, comprising the steps of injecting a treatment fluid in an injector borehole and producing formation fluids from a producer borehole with the injector borehole and producer borehole being boreholes branching off a single well such that the treatment fluid sweeps a volume of the formation between the injector and producer boreholes; deploying one or more downhole monitoring devices; and using the devices to determine how effectively the treatment fluid has swept the formation between the boreholes.

  2. Claim 2Depends on #1

    A method in accordance with claim 1 , wherein the step of determining how effectively the treatment fluid has swept the formation between the boreholes includes the step of determining the volume of the formation swept by the treatment fluid and produced from the producer borehole.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (17)

Non-Patent Literature (2)

  • Ohmer, H., et al., Well Construction and Completion Aspects of a Level 6 Mulitlateral Junction, Society of Petroleum Engineers Annual Technical Conference and Exhibition, Dallas, Texas, Oct. 2000, SPE 63116, pp. 1-12.
  • Patent Cooperation Treaty International Search Report, Form PCT/ISA/210, Date of mailing Dec. 14, 2009, pp. 1-3.