Injection testing a subterranean region
Abstract
In some aspects, an injection rate of an injection test applied to a subterranean region is controlled. The injection test includes a series of injection periods and shut-in intervals. Each of the injection periods is followed by a respective one of the shut-in intervals. The subterranean region is monitored during the injection test.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 46 · Forward citations: 17.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A subterranean region testing method comprising: controlling an injection rate of an injection test applied to a subterranean region, the injection test comprising a time series of injection periods and shut-in intervals, each of the injection periods temporally followed by a respective one of the shut-in intervals, wherein controlling the injection rate comprises: maintaining a first constant injection rate during a first injection period; maintaining a shut-in interval between the first injection period and a second subsequent injection period; and maintaining a second, different constant in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 17 total)
References Cited — Backward Prior Art (46)
Non-Patent Literature (3)
- Gidley et al, "Recent Advances in Hydraulic Fracturing", Society of Petroleum Engineers, Published in 1989, (pp. 59-60 and 283), 5 pages.
- Hamid et al, "Injection System for Microfrac or Step-Rate Testing", SPE Society of Petroleum Engineers, SPE 21267, Oct. 31-Nov. 2, 1990, 6 pages.
- Railroad Commission of Texas, "Injection/Disposal Well Permit Testing and Monitoring Seminar Manual", [retrieved from internet on Sep. 5, 2013], www.rrc.state.tx.us/forms/publications/HTML/fsrt.php, 1 page.