Surge chamber assembly and method for perforating in dynamic underbalanced conditions
Abstract
A surge chamber assembly ( 70 ) for use in a wellbore includes a housing ( 80 ) having one or more openings ( 112 ), a surge chamber ( 100 ) and a combustion chamber ( 98 ). The openings ( 112 ) provide fluid communication between the exterior ( 82 ) of the housing ( 80 ) and the surge chamber ( 100 ). A sleeve ( 114 ) is slidably positioned within the housing ( 80 ) and has a first position wherein fluid communication through the openings ( 112 ) is prevented and a second position wherein fluid communication through the openings ( 112 ) is allowed. A combustible element ( 124 ) is positioned in the combustion chamber ( 98 ) such that combusting the combustible element ( 124 ) generates pressure in the combustion chamber ( 98 ) that actuates the sleeve ( 114 ) from the first position to the second position.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 43 · Forward citations: 14.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A surge chamber assembly for use in a wellbore, the surge chamber assembly comprising: a housing having an opening, a surge chamber and a combustion chamber, the opening providing fluid communication between the exterior of the housing and the surge chamber; a sleeve slidably positioned within the housing having a first position wherein fluid communication through the opening is prevented and a second position wherein fluid communication through the opening is allowed; and a combustible element positioned in the combustion chamber such that combusting the combustible element actuates the sleev
- Claim 2Depends on #1
The surge chamber assembly as recited in claim 1 wherein the combustible element further comprises a propellant.
- Claim 3Depends on #1
The surge chamber assembly as recited in claim 1 wherein the combustible element further
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (14 of 14 total)
References Cited — Backward Prior Art (43)
Non-Patent Literature (5)
- "Comparison of Balanced and Unbalanced Perforating"; JPT; Oct. 1999; pp. 64-66.
- "Optimum Completion Design"; TCP Virtual Field Guide; 263 pages (undated but admitted Prior Art).
- "Optimum Completion Design"; Vann Systems; 19 pages (undated but admitted Prior Art).
- Andersen et al.; "Exploiting Reservoirs with Horizontal Wells: The Maersk Experience"; Offshore; Feb. 1991; pp. 23-32.
- Arora et al.; "The Nature of the Compacted Zone Around Perforation Tunnels"; SPE International Symposium on formation Damage Control; SPE 58720; feb. 23-24, 2000; pp. 1-12.