Methods of perforating and testing wells using coiled tubing
Abstract
Methods of draw-down and build-up testing on existing production wells are disclosed. The testing may be accomplished without removing the production tubing string from the well. The production of the well is shut down and then a coiled tubing test string is run down into the production tubing string. The coiled tubing test string includes a coiled tubing string, a tester valve carried by the coiled tubing string, and a test packer carried by the coiled tubing string. The test packer is set within one of the casing bore and the production tubing bore above perforations which communicate the casing bore with a subsurface formation. Draw-down and build-up testing of the subsurface formation can then be accomplished by opening and closing the tester valve to selectively flow well fluid up through the coiled tubing string or shut in the coiled tubing string. After the draw-down/build-up testing is completed, the coiled tubing test string is removed from the well and production of the well is resumed up through the production tubing bore of the production tubing string. Optionally, the coiled tubing test string may carry a perforating gun to perforate a new zone of the well which may th
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 70.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of testing a subsurface zone of a production well, said well having a casing set in a borehole intersecting said subsurface zone, said casing having a casing bore, said well further having a production tubing string received within said casing and having a production tubing bore, and a production facet sealing between said casing bore and said production tubing string above said subsurface zone, said well having previously been on production by flowing well fluid up through said production tubing bore, said method comprising: (a) shutting down production of said well through said prod
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 70 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (4)
- "Proposal to Develop and Evaluate Slim Hole and Coiled Tubing Technology" prepared by Maurer Engineering Inc., of Houston, Tex., dated Sep., 1991.
- Proposal to Develop and Evaluate Slim Hole and Coiled Tubing Technology prepared by Maurer Engineering Inc., of Houston, Tex., dated Sep., 1991.
- SPE 17581 entitled "Coiled Tubing in Horizontal Wells" by R. E. Cooper, Pt. Dowell Schlumberger Indonesia, Nov., 1988.
- SPE 17581 entitled Coiled Tubing in Horizontal Wells by R. E. Cooper, Pt. Dowell Schlumberger Indonesia, Nov., 1988.