Pressurized water reactor shutdown method
Abstract
A reactor coolant system of a pressurized water nuclear reactor with fuel assemblies in the core is simultaneously shutdown and decontaminated in less than 90 hours after the shutdown is initiated. A LOMI or Can-Derem decontamination reagent is added to reactor coolant to reduce iron and nickel in oxidized coatings before removing dissolved hydrogen and reducing the gamma emitting activity of the reactor coolant.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A shutdown method for a pressurized water reactor (PWR) following interruption of power operation, the PWR having a reactor coolant system (RCS) including a reactor pressure vessel (RPV) containing fuel assemblies, comprising the steps of: cooling reactor coolant containing dissolved hydrogen in the RCS; adding boron to the reactor coolant in the RCS; adding a decontamination reagent into the boron-containing reactor coolant, the decontamination reagent including a reducing agent to reduce iron and nickel in the RCS and a chelant to complex the iron and nickel; circulating the reactor coolant
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (13 of 13 total)
References Cited — Backward Prior Art (10)
Non-Patent Literature (1)
- M.E. Pick et al, Chemical Decontamination of Water Reactors. CEGB Developments and the International Scene, CEGB, Berkeley Nuclear Laboratories, pp. 433-444.