Method and system for managing construction machine, and arithmetic processing apparatus
Abstract
A method and system for managing a construction machine whereby working time for each of different parts of a hydraulic excavator is measured. Measured data is stored in a memory of a controller and then transferred to a base station computer via satellite communication to be stored in a database. At each repair/replacement of a part in each hydraulic excavator, the base station computer calculates, based on the operation data, a replacement time interval of the part on the basis of the working time per section to which the part belongs, and then stores and accumulates it. The base station computer also reads the stored data for each hydraulic excavator, determines, for each part, a replacement rate of the part having a substantially equal replacement time interval, and calculates a target replacement time interval of the part in accordance with the replacement time interval corresponding to a maximum replacement rate.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 32.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for managing a construction machine, the method comprising: a first step of measuring a working time for each section in each of a plurality of construction machines, and storing and accumulating the measured working time as operation data for each construction machine in a database; a second step of determining, based on repair/replacement data for each part of the construction machine and said operation data, an actual repair/replacement time interval of each part on the basis of the working time per section to which the relevant part belongs; and a third step of statistically proce
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 32 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (1)
- Iglesias, Jose, "Maintenance Planning Made Easy", Engineering & Automation, Siemens AG, XVIII, No. 5, 1996, pp. 28-29.