Patents
US 6,832,175 B2#2168379 Most CitedExpiredUnited States (USPTO)Utility

Method for managing construction machine, and arithmetic processing apparatus

31Forward Citations (#2168379 Global)
1.4/yrCitation Velocity (#3897964 Global)
4.06Citation PageRank (#4640374 Global)
14Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A hydraulic excavator 1 working in fields includes a controller 2 for measuring a working time for each of an engine 32 , a front 15 , a swing body 13 , and a travel body 12 , storing measured data in a memory of the controller 2 , and then transferring it to a base station computer 3 via satellite communication, an FD, etc. The transferred data is stored as a database 100 in the base station computer 3 . The base station computer 3 reads the data stored in the database 100 for each hydraulic excavator, calculates a working time of a part belonging to each section on the basis of the working time of that section, and compares the calculated working time with a preset target replacement time interval of the relevant part, thereby calculating a remaining time up to next replacement of the relevant part and managing the scheduled replacement timing thereof. Thus, the appropriate scheduled replacement timing of parts can be determined even in a construction machine having a plurality of sections that differ in working time from each other.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 31.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for managing a construction machine, the method comprising: a first step of measuring a working time for each of sections in each of a plurality of construction machines, transferring the measured working time for each section to a base station computer, and storing and accumulating the transferred working time as operation data in a database; a second step of, in base station computer, reading the operation data regarding a particular construction machine from said database and calculating a scheduled repair/replacement timing of a part belonging to each section on the basis of the w

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗