Patents
US 6,876,894 B1#1231214 Most CitedExpiredUnited States (USPTO)Utility

Forecast test-out of probed fabrication by using dispatching simulation method

43Forward Citations (#1231214 Global)
2.0/yrCitation Velocity (#1925617 Global)
6.07Citation PageRank (#2419114 Global)
7Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and apparatus for simulating the functioning of various configurations of fabrication and test equipment within a manufacturing line creates a schedule for dispatching of the production lots to the manufacturing line. Based on the product mix forecast, the product volume forecast, the predicted sales schedule, the sales confidence, the actual sales order descriptions, and the product delivery schedule, a potential product dispatch schedule is established that enables a product to be fabricated within the manufacturing line. An equipment dispatch schedule for equipment employed in fabrication and testing of the product to be fabricated is defined according to the product dispatch schedule. The potential product dispatch schedule is then simulated based on the process and test equipment model. Upon completion of the simulation, the potential product dispatch schedule is assessed for optimization.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 43.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for scheduling fabrication and testing of product within a manufacturing line comprising the steps of: a) creating a process equipment model for equipment and processes within said manufacturing line; b) generating a potential product dispatch schedule for the product to be fabricated within said manufacturing line; c) defining an equipment dispatch schedule for equipment employed in fabrication and testing of said product to be fabricated according to said product dispatch schedule; d) simulating said potential product dispatch schedule; e) determining if said potential product dispa

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 43 total)

PatentTitleYearCitations
US 2008255924 A1Computer-Implemented Forecast Accuracy Systems And Methods—11
US 2013151447 A1Method and apparatus for self-learning and self-improving a semiconductor manufacturing tool—8
US 2011060443 A1Scheduling modeling system for adaptive, automated data collection and performance analysis of manufacturing system for optimal scheduling—27
US 2009149967 A1Management System for Operation Items Used in Manufacturing—0
CN 117,035,255 BRobust scheduling method for manufacturing system containing unreliable resources20240
US 2007282477 A1Method and system for controlling process tools by interrupting process jobs depending on job priority—11
US 2009005895 A1Method to imporove the performance of a distrubuted scheduler—1
US 7,458,058 B2Verifying a process margin of a mask pattern using intermediate stage models20081
US 2011208337 A1Prediction and scheduling server—8
US 2009119077 A1Use of simulation to generate predictions pertaining to a manufacturing facility—9
CN 114,430,815 ASelf-learning manufacturing scheduling method for flexible manufacturing system and equipment—1
WO 2021/052589 A1Method for self-learning manufacturing scheduling for a flexible manufacturing system and device—6
US 8,218,448 B1Control networks providing reliable communications between different entities20125
US 2006242002 A1Validation and analysis of JDF workflows using colored Petri nets—49
CN 117,035,255 ARobust scheduling method for manufacturing system containing unreliable resources—0

Non-Patent Literature (5)

  • "Deadlock-Free Scheduling of Flexible Manufacturing Systems Based on Heuristic Search and Petri Net Structures," Jong et al., IEEE Int'l Conf. on Sys., Man, and Cybernetics, 1998, vol. 1, pp. 26-31.
  • "Generic Workflow Models: How to Handle Dynamic Change and Capture Management Information?," van der Aalst, Proc.-1999 IFCIS Int'l Conf. on Coop. Info. Systems, 1999 Edinburgh, UK, pp. 115-126.
  • "Modeling and Analyzing Workflow Using a Petri-New Based Approach," van der Aalst et al., Proc. 2nd Workshop on Computer-Supported Coop. Work, Petri Nets and Related Formalisms, pp. 31-50, 1994.
  • "Modeling and Performance Analysis of Workflow Management Sys. Using Timed Hierarchicad Colored Petri Nets, " Salinifard et al., Proc. ICGIS 2002, vol. 2, pp. 843-845.
  • "Modeling, Scheduling and Prediction in Wafer Fabrication Systems Using Queuing Petri Net and Genetic Algorithm", Wen et al., Proc. 2001 IRCA. IEEE Int'l Conf. on Robotics & Automation, 2001, vol. 4, pp. 3559-3564.