A production management system has a plurality of pieces of production apparatus, a production controller connected online to the production apparatus, and a simulator. The simulator performs a simulation of physical distribution for a specified period of time through use of a simulation parameter, apparatus information, and process information, which are acquired from the production controller. A re-simulation of physical distribution is performed while taking, as parameters for optimizing physical distribution, time-series data pertaining to the availability factor of each apparatus and the load factor of each apparatus obtained as a result of the simulation, as well as the start and termination times of an event which is to arise in the period of a simulation. A dispatch rule set for each apparatus or a group of pieces of apparatus having a single function is dynamically changed, thus feeding back the change to control of real physical distribution.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 37.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A production management system comprising: at least one of a production controller connected online to a plurality of pieces of production apparatus and a data Processing apparatus connected online to an offline management apparatus having a production management function; and a simulator, wherein the simulator performs a simulation of physical distribution for a specified period of time through use of a simulation parameter, apparatus information, and process information, which are acquired from the production controller or the offline management apparatus: the simulator performs a re-simulat

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 37 total)

PatentTitleYearCitations
CN 100,476,733 CSystem and method for semiconductor simulation on tool20090
US 8,032,348 B2System and method for using first-principles simulation to facilitate a semiconductor manufacturing process20114
US 2008195857 A1Techniques For Automatic Registration Of Appliances—20
US 2024232758 A1Apparatus and method for establishing production plan—0
US 2005097012 A1Production planning method and apparatus—7
US 2005071036 A1System and method for using first-principles simulation to characterize a semiconductor manufacturing process—37
US 2005071037 A1System and method for using first-principles simulation to analyze a process performed by a semiconductor processing tool—39
US 6,795,742 B1Production management method in a plurality of production lines200425
US 2006047354 A1Prediction of the degree of delivery realiability in serial production—1
US 6,876,894 B1Forecast test-out of probed fabrication by using dispatching simulation method200543
US 8,073,667 B2System and method for using first-principles simulation to control a semiconductor manufacturing process20115
US 8,738,410 B2Methods and systems for managing electronic work instructions for manufacture of product20145
US 2005071039 A1System and method for using first-principles simulation to provide virtual sensors that facilitate a semiconductor manufacturing process—65
US 2003078682 A1Simulation apparatus and simulation method—8
US 9,665,668 B2Configuring a dispatching rule for execution in a simulation20175