Patents
US 6,766,254 B1#504729 Most CitedExpiredUnited States (USPTO)Utility

Method for updating an earth model using measurements gathered during borehole construction

69Forward Citations (#504729 Global)
3.1/yrCitation Velocity (#802455 Global)
9.60Citation PageRank (#1135317 Global)
12Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and system for real time updating of an earth model. The efficiency with which an oil or gas well is constructed can be enhanced by updating the relevant earth model using real-time measurements of the effective density of the drilling fluid and other parameters. The method includes generating an earth model used for predicting potential problems in drilling of a borehole having a predetermined trajectory. Evaluations of the state of the borehole and local geological features are obtained which are based on the earth model. Real time data is used to create a diagnosis of the state of the borehole and local geological features. The evaluations are compared with a diagnosis to identify inconsistencies. A component of the earth model is identified that is both related to the identified inconsistency and has a high degree of uncertainty. The selected component of the earth model is then updated prior to completing construction of the borehole using the received data.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 69.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for updating an earth model comprising the steps of: obtaining an earth model used for predicting potential problems in drilling of a borehole having a predetermined trajectory, the earth model comprising a plurality of components; predicting one or more conditions under which the borehole will fail based on the earth model; receiving data gathered during the construction of the borehole; comparing the predicted failure conditions with a diagnosis of the borehole to identify at least one inconsistency, the diagnosis being based on the received data; selecting a component of the earth

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • "Application of Probabilistic Techniques for Assessing Sand Production and Borehole Instability Risks", McLellan et al., Soc. of Petroleum Eng., SPE 47334, Jul. 1998.*
  • "Modeling of Yielded Zone Enlargement Around a Wellbore", Hawkes et al., Proceedings of the 2<nd >North American Rock Mechanics Symposium, Jun. 19-21, 1996.*
  • "Modeling of Yielded Zone Enlargement Around a Wellbore", Hawkes et al., Proceedings of the 2nd North American Rock Mechanics Symposium, Jun. 19-21, 1996.*
  • Addis, M.A., Hanssen, T.H., Yassir, N., Willoughby, D.R. and Enever, J.: 'A comparison of leak-off test and extended leak-off test data for stress estimation', paper SPE/ISRM 47235 presented at the 1998 Eurock Rock Mechanics in Petroleum Engineering Conference, Trondheim, Jul. 8-10.
  • Bourgoyne, A.T., Chenevert, M.E., Millheim, K.K. and Young, F.S.: Applied Drilling Engineering, SPE Textbook Series, vol. 2 (1991), pp113-191, pp220-245.