Method and system for prioritizing and allocating well operating tasks
Abstract
A method for managing well construction operations includes accepting as input to a computer a list of tasks required to complete construction of at least one wellbore, the list of tasks having at least an initial chronological order. Measurements of at least one parameter related to at least one task on the list of tasks is entered into the computer. The list of tasks is prioritized by at least one of changing a chronological order of performance or a length of time to complete at least one of the tasks based on measurements of the at least one parameter. The prioritizing is performed to optimize at least one well construction performance parameter. The prioritized list is displayed to at least one user of the computer.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 17.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for correcting directional drilling of a wellbore, comprising: determining, via equipment at a well, a correction to the directional drilling of the wellbore to be performed ahead of a change in drilling fluid flow rate; applying, by a drilling motor, a torque to a drill pipe to begin the directional drilling; measuring, by sensors of the equipment, a spatial position of the wellbore at a well segment depth, a pressure of drilling fluid at the wellbore, influx of formation fluid at the wellbore, loss of the drilling fluid at the wellbore, a fracture gradient and pore pressures of subs
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗