Method of building underground cavern and tunneling machine
Abstract
A method of forming an underground cavern aiming at forming an underground cavern of a large scale at a very deep place in soft ground and soft rock layers safely and economically, and a tunneling machine suitable for use in carrying out the method. This method of forming an underground cavern consists of the steps of forming a ground reinforcing zone around a portion intended to be hollowed out before froming an underground cavern to be built, and then excavating the inside surrounded by the ground reinforcing zone. Further, the above-mentioned tunneling machine comprises a ring-shaped body having a first ring, a second ring, and a third ring; a boring device mounted between the second ring and propelling jacks for boring a plurality of holes extending radially from the inner surface of the tunnel into the ground; and a reinforcing material filling device mounted also between the second ring and the propelling jacks for filling a reinforcing material and a grout into each of the holes.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of building an underground cavern having a ground reinforcing zone, comprising the steps of: digging a shaft from the ground surface to a location corresponding to a portion of said ground reinforcing zone; providing a starting station at said location corresponding to a portion of said ground reinforcing zone; providing a tunneling machine in said starting station; advancing said tunneling machine from said starting station so as to dig out a series of tunnels, said tunnels enclosing a portion to be hollowed out; digging a plurality of holes from the inner surfaces of said tu
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (7 of 7 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (2)
- Baumaschine & Bautechnik, BMT, vol. 29, No. 6, Jun. 1982, pp. 302 307, Wiesbaden, DE; A. Eber et al, Bauverfahren f r das Auffahren sehr grosser untert giger R ume , p. 305, col. 2 p. 307, col. 2, FIGS. 2, 3, 5.
- Baumaschine & Bautechnik, BMT, vol. 29, No. 6, Jun. 1982, pp. 302-307, Wiesbaden, DE; A. Eber et al, "Bauverfahren fur das Auffahren sehr grosser untertagiger Raume", p. 305, col. 2-p. 307, col. 2, FIGS. 2, 3, 5.