Method of reinforcing tunnels before excavation
Abstract
This invention relates to a method of reinforcing tunnels which comprises driving a crown drift along the top of the proposed tunnel, driving a pair of wall plate drifts along opposite sides of the proposed tunnel in spaced substantially parallel relation beneath and to one side of the crown drift, drilling a longitudinally spaced aligned or staggered series of small diameter bores downwardly and outwardly in both directions from within the crown drift along the ceiling of the proposed tunnel, drilling other series of similar bores upwardly from within the wall plate drifts along the walls of the proposed tunnel, said ceiling and wall bordering bore patterns being inclined toward one another and of a length such as to produce a skewed overlapped relation, inserting reinforcing rods into the bores of each series thereof so as to produce a metal curtain between drifts bordering the perimeter of the proposed tunnel, grouting the rods permanently in place within their respective bores, filling the drifts back up with concrete and removing the material within the arch defined by the refilled drifts and metal curtain therebetween. The invention also encompasses a method wherein the addit
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 25.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
The method of reinforcing the perimeter rock bordering a tunnel formed through rock preparatory to excavating same which comprises the steps of: excavating a crown drift along the top of the proposed tunnel, excavating a pair of wall plate drifts along opposite sides of the proposed tunnel in spaced substantially parallel relation beneath and to the sides of the crown drift, drilling a longitudinally spaced series of small diameter bores downwardly and outwardly in both directions from within the crown drift along the ceiling of the proposed tunnel, drilling other series of similar bores upwar
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 25 total)
References Cited — Backward Prior Art (3)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 3,508,406 A | Composite arch structure | 1970 | 27 |
| DE 1,809,326 A1 | Verfahren zur Herstellung eines Tunnels oder Stollens | — | 2 |
| US 3,631,680 A | Construction of tunnels | 1972 | 9 |