In-situ fluid compatibility testing using a wireline formation tester
Abstract
A method for performing fluid influx tests in a wellbore ( 3 ) traversing a permeable formation ( 4 ) to test the compatibility of one or more completion fluids comprises: a) inserting a well test device ( 1 ) comprising a straddle packer assembly ( 6 A, 6 B) into the wellbore ( 3 ) such that the straddle packer assembly ( 6 A, 6 B) separates a well test section ( 13 ) from other sections of the wellbore; b) performing a first fluid influx test during which the fluid pressure the test section ( 13 ) is reduced, pore fluid is induced to flow from the pores of the permeable formation ( 4 ) into the test section ( 13 ) and fluid influx into the test section ( 13 ) is monitored; c) injecting a completion fluid into the test section ( 13 ), thereby increasing the fluid pressure within the test section and inducing the completion fluid to flow into the pores of the surrounding formation ( 4 ); d) performing a second fluid influx test during which the fluid pressure within the test section ( 13 ) is reduced, the completion fluid and pore fluid are induced to flow into the test section, and fluid influx into the test section is monitored; e) comparing fluid influx monitoring data acquired
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 31.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗