Integrated pipe handling method for well completion and production
Abstract
A novel integrated pipe handling system and method is provided wherein one or more pipe tubs having lift arms can be loaded with pipe and transported to a drill site where it may be deployed next to a pipe handling trailer. The pipe tubs and pipe handling trailer are arranged such that when the lift arms are raised, pipes may roll from a tub to the trailer, where a pipe is transferred to an angularly adjustable trough on the trailer. The trough may be raised to a preselected position and the pipe moved along the trough by a skate such that the pipe is available to be transferred from the pipe handling trailer to a drilling rig. The process may be reversed to remove pipe from the drilling rig. A control system, which may be operated in a manual or automated mode, is used to operate the integrated system using information about each pipe joint recorded during the loading process.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 35 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of raising a cylindrical object on a movable platform to a feed position comprising the steps of: providing a movable platform comprising a horizontal platform, an angularly movable surface for receiving a said cylindrical object and moving said cylindrical object at an angle with respect to said horizontal platform, and a skate slidably movable along said angularly movable surface for supporting said cylindrical object on said angularly movable surface at a plurality of positions along said angularly movable surface; causing said angularly movable surface and said skate to move said
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2019376354 A1 | Integrated pipe handling system for well completion and production | — | 7 |
References Cited — Backward Prior Art (35)
Non-Patent Literature (5)
- Annex to PCT/IBA/206, Partial International Search Report dated Aug. 23, 2019, issued in PCT/US2019/034957.
- Form PCT/IBA/206 Invitation to Pay Additional Fees dated Aug. 23, 2019, issued in PCT/US2019/034957.
- Information on Search Strategy issued in PCT/US2019/034957.
- Little Tripper™ Data Sheet, Forum Energy Technologies (Jan. 2018).
- Provisional Opinion on Patentability issued in PCT/US2019/034957.