Method and apparatus for offline standbuilding
Abstract
A method and apparatus for moving pipe on a rig floor between a number of different stations are provided. Generally the apparatus includes pipehandling equipment arranged to interact with an off-floor rack, a preparation opening, a borehole, and a storage area, such that tubulars can be loaded onto the drill floor, prepared at the preparation opening, loaded onto or off of the storage rack, and connected to a drill string while drilling is simultaneously conducted at borehole. In one embodiment, the system includes at least two pipehandling devices for communicating pipe between a storage area off the drill floor, a storage area on the drill floor, at least one preparation opening, and a drill opening.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 54.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for handling tubular body sections at a drilling site comprising: a drill platform having a derrick extending upwards therefrom, the drill platform and derrick defining a drill area; a first hoist connected to an upper part of the derrick for passing a tubular body through a drilling opening defined in the drill platform; at least one storage area being arranged within the drill area for storing a plurality of tubular lengths, each of the tubular lengths comprising at least two releasably interconnected tubular body sections; at least one preparation opening extending through the dril
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 54 total)
References Cited — Backward Prior Art (18)
Non-Patent Literature (1)
- International Search Report for International Application no. PCT/US03/39569; 5pp.