Patents
US 10,198,702 B2#61302663 Most CitedActiveUnited States (USPTO)Utility

End-to end project management

1Forward Citations (#61302663 Global)
0.1/yrCitation Velocity (#40732692 Global)
0.75Citation PageRank (#61302663 Global)
50Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A device may provide a user interface for receiving project information for a software implementation project. The project information may be associated with a set of requirements defining the software implementation project. The project information may be associated with a set of deliverables describing results of the software implementation project. The device may generate an initial project plan based on the project information. The device may receive information regarding the initial project plan during fulfillment of the project plan. The device may selectively provide an alert associated with the initial project plan based on receiving the information regarding the initial project plan. The device may selectively generate a modified project plan based on receiving the information regarding the project plan.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A device, comprising: one or more memory devices; and one or more processors, connected to the one or more memory devices, configured to: determine configuration information including information identifying: a type of the device on which a user interface is displayed, one or more capabilities of the device, and one or more specifications associated with the device; configure, based on the configuration information, a user interface to provide a first graphical user interface for receiving project information for a software implementation project, the project information including: a set of re

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (50)

PatentTitleYearCitations
US 5,767,848 ADevelopment support system1998138
US 2004143477 A1Apparatus and methods for assisting with development management and/or deployment of products and services—154
US 2005091098 A1Assignment manager—90
US 2005114829 A1Facilitating the process of designing and developing a project—655
US 2005125274 A1System and method for resource optimization—66
US 2005159994 A1Method and apparatus for plan generation—27
US 7,051,036 B2Computer-implemented system and method for project development2006234
US 7,062,449 B1Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability and for automatically detecting task related work200686
US 7,069,229 B1Method and apparatus for planning and monitoring multiple tasks and employee work performance based on user defined criteria and predictive ability200654
US 2006190391 A1Project work change in plan/scope administrative and business information synergy system and method—167
US 2007244591 A1Production planning method and production planning system—8
US 7,337,124 B2Method and system for a quality software management process200884
US 2008082389 A1Method and system for assessing schedule performance issues of a project—33
US 2008229313 A1Project task management system for managing project schedules over a network—22
US 2008243575 A1System and Method for Dynamically Allocating Human Resources to a Project Plan—35
US 7,440,905 B2Integrative risk management system and method200827
US 2008313596 A1Method and system for evaluating multi-dimensional project plans for implementing packaged software applications—155
US 2009006164 A1System and method for optimizing workforce engagement—50
US 2009037869 A1System and method for evaluating a product development process—16
US 2009070767 A1Determining Desired Job Plan Based on Previous Inquiries in a Stream Processing Framework—14
US 2009132318 A1Project management system and method—15
US 2009177447 A1Method for Estimating Software Development Effort—12
US 2009192836 A1Automated test system project management—19
US 2009216602 A1Schedule Analyzer—40
US 2009259985 A1System development planning tool—11
US 7,624,024 B2Systems and methods for dynamically updating a dispatch plan200994
US 2010162200 A1Software development production management system, computer program, and recording medium—33
US 2010162215 A1Enabling automated real-time metrics during the software development process—27
US 2011184771 A1Implementation resource project management—66

Non-Patent Literature (4)

  • Accenture, "Rhythm of Requirements," the CMMI Institute, CMMI Conference 2014, May 2014, 15 pages.
  • Chatfield et al., Microsoft Project 2013 Step by Step, 2013, Microsoft Press.
  • Pallail et al., "Rhythm of Requirements-Domino Effect on Software Engineering Lifecycle," the CMMI Institute, CMMI Conference 2014, May 2014, 8 pages.
  • Pallail et al., “Rhythm of Requirements—Domino Effect on Software Engineering Lifecycle,” the CMMI Institute, CMMI Conference 2014, May 2014, 8 pages.