Patents
US 7,337,124 B2#341441 Most CitedExpiredUnited States (USPTO)Utility

Method and system for a quality software management process

84Forward Citations (#341441 Global)
4.7/yrCitation Velocity (#326046 Global)
9.78Citation PageRank (#1101156 Global)
24Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A quality management framework system and method for operating a quality plan in a product development organization having quality objectives. The system includes a plurality of computer implemented tools accessible by users for operating a plurality of quality processes. Data relative to the quality processes is collected and aggregated to generate quality reports. Reports are analyzed and problems are detected through a defect prevention process. Quality actions are initiated in a feedback quality management action tracking process.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 84.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer implemented method for operating a quality plan in a product development organization comprising a plurality of members and having quality objectives for product development projects, the method analyzing a quality metrics report, and comprising the steps of: defining a set of quality processes adapted to quality objectives required by an organization, wherein the set of quality processes includes: a tracking process for identifying an issue in the product development projects, the tracking process being an internal project management tracking process that reports a status of curren

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • "Appendix I: Design and Construction Changes and Problems at New US Embassy in Moscow-Quality Assurance, Part 1", Briefing Report to the Chairman, Com on the Budget, US Senate, Wash, DC, General Accounting Office, Apr. 1987. GAO-NSIAD-87-125. pp. 12-13. retrieved Mar. 2, 2006 using a DIALOG search.
  • Baresi, L, Casati, F, Castano, S, Fugini, MG, Pernici, B, "WIDE Workflow Development Methodology", p. 19-28. 1999 ACM, retrieved from ACM Portal Aug. 4, 2004.
  • Bell, Simon; Kastelic, Ted; "Inside Intel-coping with complex projects", p. 17-24, Engineering Management Journal Feb. 2001, IEEE search Nov. 24, 2005.
  • Collofello, Dr. James; Chauhan, Anamika; Rus, Ioana; Houston, Dan' Sycamore, Douglas; Smith-Daniels, Dr. Dwight; A System Dynamics Software Process Simulator for Staffing Policies Decision Support p. 103-111, 1998 IEEE, retrieved Nov. 27, 2005.
  • Muravlyova, Olga, Muravlyov, Oleg, "Quality Management Information System in Manufacturing Electrical Machines", p. 170-174, Mar. 2, 2001, retrieved from IEEE database Aug. 4, 2004.