Method of construction for fixedly embedding bar steel using filling adhesive having expansibility of inorganic system water mold
Abstract
PURPOSE:To obtain a predetermined adhesive strength by drilling a hole in concrete and filling this hole with an inorganic water hardening adhesive fixedly embedding a bar steel. CONSTITUTION:A bar steel insertion hole is drilled in a predetermined position of a concrete surface 6 by using a drill. Cutting chips in the inside of the insertion hole are removed, and an internal wall is placed in a wet condition by washing with water. Next, an adhesive material 3, having expansibility of inorganic system water hard mold, is injected by an injection gun into the hole filled with the material 3. Then a steel bar 4 is fixedly embedded in the insertion hole. In this way, a method of construction of good execution workability can be obtained even in a wet condition.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 6.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (0)
No backward patent references recorded.