JP 2015040407 A#32412057 Most CitedActiveJapan (JPO)Utility

Post-installed anchor construction method

3Forward Citations (#32412057 Global)
0.3/yrCitation Velocity (#27757657 Global)
1.10Citation PageRank (#36559538 Global)
6Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

PROBLEM TO BE SOLVED: To provide a post-installed anchor construction method capable of effectively improving pull-out strength of an anchor bar according to the opening diameter of a hole.SOLUTION: The post-installed anchor construction method includes: a boring step for forming a cylindrical hole opened on the surface of a concrete structure; a filling step for filling filler in the hole; and an inserting step for inserting an anchor bar in the hole. The filler has an expansion pressure so as to satisfy the following formula (1): 0≤Y≤-0.04X+4.7 (here, X=hole opening diameter (mm); and Y=expansion pressure of filler (N/mm)).

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 3.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗