Construction method for concrete arch bridge
Abstract
PROBLEM TO BE SOLVED: To improve a construction method for a concrete arch bridge so as to construct a long and large concrete arch bridge. SOLUTION: A synthetic arch lining construction method is used. A steel pipe arch rib 11 is formed so as to have a truss structure, concrete is filled into a steel pipe, and then a precast board or a steel panel serving also as a form is attached to a lower floor board and a side wall part of the arch rib. The arch rib is divided into zones according to the order that the deformation and stress intensity of the arch rib become below a limit value, and concrete placing of the lower floor board, a web, and an upper floor board is performed according to the order shown of, for example, (1), (2), (3), (4), and (5) to perform concrete lining for a steel pipe truss arch.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 72.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 72 total)
References Cited — Backward Prior Art (0)