Method to install underground pipe casing
Abstract
A method and apparatus for installing a pipe casing underground without a trench for distances up to 400 feet with pipe casing up to 168 inches in diameter. The system uses a modified high energy piling hammer to mobilize the energy to drive the casings or tubings that make up the instant tunnel. An example of a piling hammer used in the present invention is the IHC Hydrohammer line of models in between the S-90 and S-280. Specific models planned to be used in this invention, depending on diameter and length requirements and type of soil in the planned alignment, are the Models S-90, S-150, S-280, S-400 and S-500. The present invention's Hydrohammers are needed to be held against the casing pipe to be driven with a force equal to the reactional force of the hammer during recharging of the hammer's system. A special helmet and cutting head increase operational capabilities.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 0.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (8)
Non-Patent Literature (1)
- PATENT ABSTRACTS OF JAPAN vol. 013, no. 538 (M - 900) 30 November 1989 (1989-11-30)